A. Trench excavation, backfill, and compaction shall include, but not necessarily be limited to, the excavation, backfill, and compaction of trenches for water mains, and sanitary sewers, shown on the Drawings, and in accordance with the AW Standard …
Get a quoteEXCAVATION & BACKFILL SPECIFICATION 5 just damp, when compacted. Each layer of material shall have the uniform moisture content required to obtain the specified compaction as specified in Table 1 - Materials, Compaction, & Testing Requirements.
Get a quote3. Excavating and backfilling for buildings, walls, site walls and structures. 4. Drainage course for concrete slabs-on-grade. 5. Subsurface drainage backfill for walls and trenches. 6. Excavating and backfilling for utility trenches within the building excavation limits. 7.
Get a quoteConstruction: Introduction Concrete slabs on grade are a very common type of concrete construction. Floor slabs can range from a simple residential basement slab to a heavy-duty industrial floor. However, no matter how basic or complex the floor is, the construction method is similar and includes; preparing the sub-grade and sub-base, placing
Get a quoteAug 03, 2020 · IFB 19-16 Oak Laurel Fire Protection System Upgrades Addendum #2 ADDENDUM #2 ACKNOWLEDGEMENT To: All Vendors Date: October 2, 2018 Changes to Specifications # Item Description…
Get a quotefor public works construction 2016 edition for all specifications not specifically called out on plans, in the city of bullhead city procedures manual or arizona department of transportation may 2012 construction standard drawings depending on right of way. backfill, pavement, and surface replacement per mag std detail 200-1, 200-2, & 201.
Get a quoteCITY OF TOMBALL EXCAVATION AND BACKFILL STANDARD SPECIFICATION FOR STRUCTURES 02316-1 Liming Section 02316 . EXCAVATION AND BACKFILL FOR STRUCTURES . PART 1 G E N E R A L . 1.01 SECTION INCLUDES . A. Excavation, backfilling, and compaction of backfill for structures. 1.02 MEASUREMENT AND PAYMENT . A. Unit Prices. 1.
Get a quoteSTANDARD SPECIFICATION EXCAVATION AND BACKFILL 02318-1 Liming Section 02318 . EXTRA UNIT PRICE WORK FOR EXCAVATION AND BACKFILL . PART 1 G E N E R A L . 1.01 SECTION INCLUDES . A. Measurement and payment applicable to …
Get a quoteC. Structural Excavation, Backfill and Compaction is included in Section 312319. D. Trenching, Bedding and Backfill for Pipe is included in Section 312323 and 314000. 1.03 REFERENCE STANDARDS A. American Society for Testing and Materials (ASTM) 1. ASTM C33 - Specification for Concrete Aggregates. 2.
Get a quoteJul 18, 2017 · Founded in Ann Arbor, Michigan, D.N. Higgins expanded in 1989 with the opening of its Naples office. The company specializes in underground installations of mechanical systems, pump stations, storm water drainage systems and municipal infrastructure.
Get a quote2004 Specifications CSJ Liming5 . SPECIAL SPECIFICATION . 5762 Excavation and Backfill for Utilities . SECTION 102 . D-102.01 SCOPE: This section shall govern all excavation and backfill which will be encountered during the work, and supplements those paragraphs pertaining to …
Get a quote4) Backfill around the pipe by placing in layers no more than six (6) inches in depth. Backfill shall be compacted with light tamps for the full width of the trench to provide adequate support for the bottom and sides of the pipe. Backfill shall be carried …
Get a quoteINTERCHANGE CONSTRUCTION JANE ADDAMS MEMORIAL TOLLWAY (I-90) HIGGINS CREEK TO MOUNT PROSPECT ROAD MILE POST 73.5 TO MILE POST 74.7 WESTERN ACCESS TOLLWAY (I-490) TOUHY AVENUE TO I-90 MILE POST 5.9 TO MILE POST 6.25 S.P. 101 LOCATION AND SCOPE OF WORK The improvements to be constructed under this contract shall be performed
Get a quotefor public works construction 2016 edition for all specifications not specifically called out on plans, in the city of bullhead city procedures manual or arizona department of transportation may 2012 construction standard drawings depending on right of way. backfill, pavement, and surface replacement per mag std detail 200-1, 200-2, & 201.
Get a quoteThis specification covers the excavation, foundation preparation and back- filling for plant area buildings, all reservoir concreta structures and filling and grading in the plant area as shown on the drawings. In addition, the work under this specification shall also include: a - Grubbing, removal and disposal of stumps, roots and organic material
Get a quoteauthority specification for road works is to be used as backfill material where the sewer main is located in roads, footpaths or when the nearest part of the trench is within 1m of the paved edge of the roadway. clause 808 is to be compacted as per clause 802 of the national roads authority specification for road works.
Get a quoteExcavation and Backfill 9-1 CHAPTER 9 – EXCAVATION AND BACKFILL EXCAVATION AND BACKFILL MnDOT Standard Specifications for Construction (Spec Book) 2565.3, 2451 and 1805 serve as guidance for excavation and backfill activities. 9.1 Excavation and Backfill Specifications A basic understanding of specifications related to
Get a quoteDouglas N. Higgins Inc. 3390 TRAVIS POINTE RD A ANN ARBOR, MI 48108 Get Directions. (734) 996-9500.
Get a quote2 days ago · As an example, a price ratio of 1.5 (50 percent increase in 10 years, or 4 percent annual compound interest rate) applied to the example tree from Appendix Table 2 growing at 10 percent gives a value growth rate of 14.4 percent per year. Conclusion. Percent growth is one technique for deciding when to thin or harvest a financially mature forest.
Get a quoteCompany Name: DOUGLAS N. HIGGINS INC., dba D.N. HIGGINS, INC. Inspection Site: 107th Avenue North and 7th Street North, Naples, FL 34101 . Florida 34101, the employer did not maintain a safety and health program addressing excavation hazards program prior to allowing employees to enter and work inside a trench excavation.
Get a quote